Pile Jacket Installation

Step One:

Excavate the sea floor to permit installation over at least one foot of sound pile.

IMPORTANT: The information contained in this section is offered in good faith as a general guide to the placement of Fabriform erosion control revetments. It is based on experience obtained under a variety of conditions — however, it will not apply to every job. The user is cautioned to obtain the professional and technical services necessary to insure an effective and economical installation.

Step Two:

Clean the pile to produce a sound substrate.

Step Three:

Where required, install reinforcing steel and stand-offs.

Step Four:

Hang jacket from suspender ring, zip closed and secure at bottom.

Step Five:

Inject mortar through two hoses extending to the bottom of the jacket.

Step Six:

Remove hanger assembly and the job is complete.